Our company's current wrapping works and latest scale model issues.
“Out of Rails”: we have wrapped a Mercedes coach with the pictures of tourist and cultural places of interest of North Hungary.
Our company's current wrapping works and latest scale model issues.
“Out of Rails”: we have wrapped a Mercedes coach with the pictures of tourist and cultural places of interest of North Hungary.
8 Skoda Suberbs and 2 Ford Transits were wrapped in Munich with the design was created by us for those, who will render technical support for the locomotives, that need.
SBB Cargo ordered a design for two F4-locomotives that are scheduled to pull the alu-trains of Novelis between Sierre (CH) and Göttingen (D). The first locomotive (189-990) was wrapped in Cologne, the second one (189-994) in Basel.
Pictures of the wrapping and the locomotives in operation.
MRCE charged us with the foiling of two Vectrons for Mercitalia. It was done in Munich-Allach at the 4th April 2017. (193-641 and 193-642).
4 locos in Eisenach (D) again: No 185-606, 185-630, 185-582 és 185-605. The were renewed between 20 and 23 April 2017.
Amoung the red locos there were some of more interesting ones.
The Vectron No 193-554 of Alpha Trains was wrapped in Munich at Siemens.
Due to contract with RheinCargo we shall renew the livery of 12 Traxx-locos: they will be wrapped with the own design of RheinCargo instead of the current HGK-design. The first 4 locos (185-603, 185-604, 185-588, 185-584) was refoiled in Eisenachban (D) between 28.02.17. and 02.03.17.
The third and fourth Vectron-locomotives of Alpha Trains for TX-Logistik were wrapped by a design for “Responsibility Driven by” the above firms. The locos 193-552 and 193-553 were foiled in Munich-Allach on 25th February 2017.
Due to our contract with Alpha Trains we wrapped the first two Vectrons for TX-Logistik with the sc. magnet-design. (München-Allach (D) of 26th January 2017).